Posted on 6th March 2020
R W Hall Flooring are to begin the soft flooring works on Monday 9th March 2020 to The Bridge School, Ipswich. A brand new state of the art secondary school building with six classrooms.
The new secondary school will be on the same site as The Bridge’s primary school, which was built in 2014. The aim is is to provide the students with a smooth transition between primary and secondary education.
The new flooring will consist of Forbo vinyl, Interface carpet tiles and Forbo entrance matting.
We are looking forward to working on this project with Morgan Sindall and seeing the progression over the next few weeks.
Project – The Bridge School, Ipswich
Contractor – Morgan Sindall
Architect – Concertus Design and Property Consultants